the official website of the village

Chapter 10 Section 2

Section 10.02. REGULATIONS AFFECTING THE CONSTRUCTION OF CULVERTS, DRAIN PIPES, OR CONDUITS. (1) Size and General Construction.  All culverts, drain pipes, or other similar con­duits placed on, in or along the highways or streets of the Vil­lage...

More info

Chapter 10 Section 1

Section 10.01. ISSUANCE OF PERMIT. (1) Permit Required. [a] No person, firm or corporation shall construct or permit to be constructed, maintained or repaired within the boundaries of any street or highway in the Village of River Hills, any...

More info

Chapter 9 Section 17

Section 9.17  PENALTY.  Any person found guilty of violating any of the provisions of this Chapter shall be subject to a forfeiture of not less than Ten ($10.00) Dollars nor more than Two Thousand ($2,000.00) Dollars together with the costs of...

More info

Chapter 9 Section 16

Section 9.16  RESERVATION OF REGULATORY AND POLICE POWERS.  The Village, by the granting of a permit to excavate, obstruct and/or occupy the right-of-way, or by registering a person under this Chapter does not surrender or to any extent lose...

More info

Chapter 9 Section 15

Section 9.15  SUPPLEMENTARY NOTIFICATION.  If the excavation of the right-of-way begins later or ends sooner than the date given on the permit, Permittee shall notify the Department of the accurate information as soon as this information is...

More info

Chapter 9 Section 14

Section 9.14  WORK DONE WITHOUT A PERMIT. [a] Emergency Situations. Each Permittee shall immediately notify the Department by verbal notice on an emergency phone number provided by the Department of any event regarding its facilities that it...

More info

Chapter 9 Section 13

Section 9.13 REVOCATIONS, SUSPENSIONS, REFUSALS TO ISSUE OR EXTEND PERMITS. A. Grounds. The Department may refuse to issue a permit or may revoke, suspend or refuse to extend an existing permit if it finds any of the following grounds: (1) The...

More info

Chapter 9 Section 12

Section 9.12 OTHER OBLIGATIONS. A. Compliance with Other Laws. Obtaining a permit to excavate and/or occupy the right-of-way does not relieve Permittee of its duty to obtain all other necessary permits, licenses, and authority and to pay all fees...

More info

Chapter 9 Section 11

Section 9.11 PROJECT COORDINATION. A. Coordination of Projects. It is in the best interests of all persons to attempt to coordinate projects whenever it is reasonably possible. Therefore, periodic reporting by Permittees of known construction...

More info

Chapter 9 Section 10

RESTORATION SPECIFICATIONS-SODDING. A. Description. This shall consist of preparing sod beds, furnishing and laying of live sod on the shoulders, slopes, ditches, or other locations as designated by the Engineer, the construction of sod ditch...

More info

Chapter 9 Section 9

RIGHT-OF-WAY REPAIR. A. Timing. The work to be done under the excavation permit, and the repair of the right-of-way as required herein, must be completed within the dates specified in the permit, increased by as many days as work could not be...

More info

Chapter 9 Section 8

INSPECTION.  All construction work within the public rights-of-way shall be subject to inspection by the Village and certain types of work may have continuous inspection. It shall be the responsibility of the Permittee or his/her designee to...

More info
Phone: (414) 352-8213
River Hills, WI 53217
7650 N. Pheasant Lane